Do You Need Council Approval for a Kitchen Renovation on the Central Coast?

Renovating your Kitchen? Learn when you will need council approval

Most kitchen renovations on the Central Coast don’t need council approval. If the kitchen stays in the same room and no walls are added or removed, the work is usually classed as exempt development under NSW planning rules. Approval through a complying development certificate (CDC) or a development application (DA) is needed when the room itself changes: a wall comes out, a window gets bigger or the kitchen moves somewhere else in the house.

That’s the short version. The detail matters, though, because the line between exempt and not exempt sits in a different place than most people expect.

What you can do without council approval

NSW has a statewide set of rules, the State Environmental Planning Policy (Exempt and Complying Development Codes), usually called the Codes SEPP. It allows a range of internal work to go ahead without a DA or CDC, provided the work meets the Building Code of Australia and a few specific conditions.

For a kitchen, that generally covers:

  • Replacing cabinetry, benchtops and splashbacks
  • Installing new appliances such as ovens, cooktops, rangehoods and dishwashers
  • Moving the sink or cooktop to a new position within the same room, as long as the building’s structure and any fire-rated walls or floors aren’t affected
  • Cosmetic work like painting, flooring and new light fittings

That third point surprises a lot of homeowners. You can rework the layout of a kitchen quite significantly, swapping a galley for an island design for example, and still stay within exempt development, because the room itself hasn’t changed.
What you can’t do under the exempt rules is reduce the size of a window or door that the room relies on for light and ventilation.

When you'll need a CDC or DA on the Central Coast

The trigger that catches people out is walls. Under the Codes SEPP, exempt internal work must not change the configuration of a room. Removing a wall, even one that isn’t load-bearing, changes that configuration. So does building a new one. This is why the most common renovation request we hear, opening the kitchen up to the dining or living area, almost always needs approval. Whether the wall is structural affects how the work is engineered. It doesn’t change whether approval is required. You’ll also need a CDC or DA if the renovation involves:
  • New windows or doors, or enlarging existing openings
  • Moving the kitchen to a different room
  • Changes to the building’s structure, such as beams, posts or floor framing
  • Cutting through an external wall
If your home is a listed heritage item or sits in a heritage conservation area, check with Central Coast Council before assuming any work is exempt, as additional controls can apply.

CDC or DA: which one applies?

Both are formal approvals. The difference is who assesses the work and how much room there is for judgement.

A complying development certificate is a fast-track approval for work that meets the fixed standards in the Codes SEPP. It’s issued by a registered private certifier or by Central Coast Council, and it’s generally the quicker path because the work is checked against set criteria rather than assessed on merit.

A development application is lodged with Central Coast Council through the NSW Planning Portal and assessed on its merits. It’s needed when the project doesn’t fit the CDC standards, which is common with heritage properties or more complex structural work. A DA usually takes longer, and once it’s approved you still need a construction certificate before building starts. As a rough guide, a CDC is often issued within a few weeks, while a DA can take a couple of months or more depending on the project and Council’s workload.

In most cases, a straightforward open-plan kitchen in a standard house can go through a CDC. Which one suits your home comes down to the property and what you’re changing, and it’s worth knowing early, because it affects your overall renovation timeline.

Renovating a kitchen in a strata unit

Strata adds a separate layer of approval that has nothing to do with council. Replacing kitchen cabinets is generally treated as a minor renovation under NSW strata law, which means you need the owners corporation’s approval before work starts. If your scheme has a by-law that delegates minor renovations to the strata committee, the committee makes the decision. If it doesn’t, the request has to go to a general meeting of the owners corporation. That second path can take longer than the renovation itself to organise, so it’s worth raising early. Apartments also have fire-rated walls and floors between units. Relocating plumbing or services through those elements isn’t exempt work, which limits how far a sink or cooktop can move in many units.

Paperwork that applies even when council approval doesn't

An exempt kitchen still involves compliance. It just happens through the trades rather than through a planning approval.

Plumbing: If the sink or dishwasher moves, your licensed plumber notifies Central Coast Council before starting and books the required inspections. When the work is finished, they provide a Certificate of Compliance to Council and to you.

Electrical and gas: New circuits, relocated power points and appliance connections must be done by licensed electricians and gasfitters, who provide compliance certificates for their work. Keep these with your home records. They’re often requested when you sell.

Contracts and insurance: In NSW, any residential building work over $5,000 (including GST) needs a written contract. Above $20,000, the contractor must also provide a Home Building Compensation insurance certificate before taking a deposit, and the deposit can’t exceed 10%. Most full kitchen renovations sit above that threshold, so you should expect to see both. Costs vary widely from project to project, and our kitchen renovation cost guide explains what drives them.

How we handle approvals on Central Coast kitchen projects

The best time to sort out approvals is at the design stage, before cabinetry goes into production. A layout drawn around a wall that later can’t come out, or a sink position that strata won’t allow, costs time to redraw.

When we design a kitchen, we look at what the new layout involves and tell you plainly whether it falls within exempt development or needs a CDC or DA. Where approval is needed, we’ll advise on next steps and whether you’ll need to arrange a certifier or lodge a DA. We project manage the kitchen renovation itself, and where extra trades are needed, we discuss them with you at the time. If you’re still in the planning stage, our guide on how to prepare for a kitchen renovation covers the other early decisions worth making.

Frequently asked questions

Usually, yes. Moving a sink within the same room is generally exempt development in NSW, provided the work doesn’t affect the building’s structure or any fire-rated walls or floors. A licensed plumber still needs to notify Central Coast Council and provide a Certificate of Compliance.
Yes, in most cases. Removing any wall changes the configuration of the room, so it falls outside exempt development even if the wall isn’t load-bearing. You’ll need a CDC or a DA before the work starts.
Yes. Replacing kitchen cabinets is generally treated as a minor renovation under NSW strata law, so you need approval from the strata committee or the owners corporation, depending on your scheme’s by-laws.
Generally, yes. A CDC is checked against fixed standards by a private certifier or council, while a DA is assessed on its merits by Central Coast Council. If your project can’t meet the CDC standards, a DA is the only option.